Citify
www.citify.eu
Statement date: 2023-02-06 05:24:45
Updated: 2022-11-22
Statement date: 2023-02-06 05:24:45
Updated: 2022-11-22
Parameters
Public presentation
Related companies 4
Articles 7
Territory
Area size
2,04 ha
Area density
10 %
Area intensity
0,15
Amount of greenery
- %
Technical parameters
Volume
15 000,00 m3
Gross size
2 041,00 m2
Overground size
2 041,00 m2
Underground size
0,00 m2
Useful area
0,00 m2
Floors
4
Height
18 m
Underground floors
0
Length
0 km
Transport
Proposal documents
- Proposed2021-11-15
- Public
viewing2021-11-22 - Under review
- Accepted2021-11-30
Date and location
Begin: 2021-11-22 17:00
Info source
Related companies
Developer
Contacts
+37046343276,
info@keltas.lt
Architect
Media articles
NAUJĄ KELEIVIŲ STOTĮ SMILTYNĖS PERKĖLOJE TIKISI PASTATYTI PER DVEJUS METUS 2022-11-14 • structum.lt |
KLAIPĖDOJE IŠDUOTAS LEIDIMAS STATYTI STUDIJOS „ALTITUDĖS“ PROJEKTUOTĄ NAUJOSIOS PERKĖLOS TERMINALĄ 2022-10-05 • structum.lt |
Paskelbtas konkursas Smiltynės perkėlos infrastruktūros atnaujinimui 2022-03-20 • vz.lt |
Naujojo Smiltynės terminalo pastato projektas užstrigo dėl techninės klaidos 2021-11-11 • vz.lt |
Naujoji perkėla „perduota“ statybininkams 2021-02-10 • atviraklaipeda.lt |
„Smiltynės perkėla“ investuos 20 mln. eurų: stato modernų keltą ir pastatą su terasa ant marių kranto 2020-07-10 • 15min.lt |
Klaipėdoje 2021 m. turėtų iškilti Naujosios perkėlos terminalas 2019-04-11 • vz.lt |
Nearby projects (500m)
Updated: 2022-11-22
Planned
Reconstruction
Begin
2021 Q1
End
2024
Stages
Permit number
RSIYV-30-220928-00009
Permit date
2022-09-28
Location
Embed
Construction photos
Construction photos are uploaded by our community. Citify is not responsible for their content.